The long awaited new
Inverportshire Main Station in
Blethergate Rookery is currently under construction. The station in
Inverportshire has largely been completed, the tunnel to
Welatunelton has been dug and the curve near
Cuddy Neuk has been completed. A complex iron frame has been constructed to bear the load of the buildings on the
Cuddy Neuk curve. The complex overpasses in
Welatunelton are on their way to completion, while the route connecting to
Edminton is nearly complete. The route north has been plotted and construction will begin shortly.
Even though a lot of the visible construction is complete, complex technical construction processes still lay ahead: Rail safety, watchtower and substations.
Planning for a street connecting the station to
Inverportshire has started too.